Scientific American Supplement, No. 484, April 11, 1885 | Page 2

Not Available
side spans, being necessarily constructed to carry across a large space, would be too near the ground to justify the omission of further supports. The question was, therefore, narrowed to a comparison between the present arch and a central independent girder of the same span, including the piers on which it rests. The small side spans could obviously be left out in each case. The comparison was made with a view not only to arrive at a decision in this particular case, but also of answering the question of the economy of the arch more generally. The following table contains the weights of geometrically similar structures of three different spans, of which the second is the one here described. The so-called theoretical weight is that which the structure would have if no part required stiffening, leaving out also all connections and all wind bracing. The moving load is taken at one ton per foot lineal, and the strain on the iron at an average of four tons per square inch. The proportion of the girder is taken at 1 in 8.
--------------+-----------------------+------------------------+ | Theoretical Weight. | Total Weight. | Span in Feet. +-----------------------+------------------------| | Arch. | Girder. | Arch. | Girder. | --------------+---------+-------------+------------+-----------| 100 | 0.0724 | 0.1663 | 0.1866 | 0.2443 | 220 | 0.1659 | 0.4109 | 0.4476 | 0.7462 | 300 | 0.2414 | 0.6445 | 0.6464 | 1.2588 | --------------+---------+-------------+------------+-----------+ |<------------Tons per foot lineal.------------->|
It can be seen from these results that the economical advantage of the arch increases with the span. In small arches this advantage would not be large enough to counterbalance the greater cost of manufacture; but in the arch of 220 ft. span the advantage is already very marked. If the table were continued, it would show that the girder, even if the platform were artificially widened, would become impossible at a point where the arch can still be made without difficulty. The calculations leading to the above results would occupy too much space to make it desirable on this occasion to produce them. Our two views are from photographs.--_The Engineer._
* * * * *

TORPEDO SHIPS.
Commander Gallwey lately delivered an interesting lecture on the use of torpedoes in war before the royal U.S. Institution, London, discussed H.M.S. Polyphemus, and urged as arguments in her favor: 1. That she has very high speed, combined with fair maneuvering powers. 2. That she can discharge her torpedoes with certainty either ahead or on the beam when proceeding at full speed. 3. That her crew and weapons of defense are protected by the most perfect of all armor possible, namely, 10 ft. of water. 4. That she only presents a mark of 4 ft. above the water line.
Then, he asked, with what weapon is the ironclad going to vanquish these torpedo rams? Guns cannot hit her when moving at speed; she is proof against machine guns, and, being smaller, handier, and faster than most ironclads, should have a better chance with her ram, the more especially as it is provided with a weapon which has been scores of times discharged with certainty at 300 yards. The ironclad, he answered, must use torpedoes, and then he maintained that the speed and handiness of the Polyphemus would enable her to place herself in positions where she could use her own torpedo to advantage, and be less likely to be hit herself. He then called attention to the necessity for well-protected conning towers in these ships, and prophesied that if a submarine ship, armed with torpedoes, be ever built, she will be the most formidable antagonist an ironclad ever had; and the nearer the special torpedo ship approaches this desideratum the better she will be.
* * * * *

A PLUMBING TEST.
A recent trial of a smoke rocket for testing drains, described by Mr. Cosmo Jones in the _Journal of the Society of Arts_, is deserving of interest. The one fixed upon is 10 in. long, 2? in. in diameter, and with the composition "charged rather hard," so as to burn for ten minutes. This gives the engineer time to light the fuse, insert the rocket in the drain, insert a plug behind it, and walk through the house to see if the smoke escapes into it at any point, finishing on the roof, where he finds the smoke issuing in volumes from the ventilating pipes. The house experimented upon had three ventilating pipes, and the smoke issued in dense masses from each of them, but did not escape anywhere into the house, showing that the pipes were sound. If the engineer wishes to increase the severity of the test, he throws a wet cloth over the top of the ventilating pipe, and so gets a slight pressure of smoke inside it.
* * * * *

THE GAS ENGINE.[1]
[Footnote 1: Lecture by Mr.
Continue reading on your phone by scaning this QR Code

 / 48
Tip: The current page has been bookmarked automatically. If you wish to continue reading later, just open the Dertz Homepage, and click on the 'continue reading' link at the bottom of the page.